Professional EV Charger Installation & Commissioning
From initial site survey and electrical load calculations to civil excavation, transformer commissioning, and OCPP software integration — Anax provides end-to-end, safety-compliant EV charger installation across commercial, fleet, and residential properties in India.

Complete 8-Step Installation Process
From preliminary electrical assessment to testing and round-the-clock maintenance, we oversee every phase of EV charging infrastructure deployment.
Consultation & Requirements
Understanding your fleet or property requirements, expected daily charging demand, vehicle types, and business model.
Site Survey & Feasibility
Detailed physical and electrical site inspection: transformer capacity, cable route distance, physical space, and cellular signal.
Electrical Load Assessment
Analyzing DISCOM sanction load, calculating peak draw, and coordinating sanction load enhancement applications if necessary.
Charger Selection & Supply
Recommending the optimal mix of AC and DC fast chargers tailored to dwell times, power availability, and budget.
Infrastructure & Civil Works
Excavation, civil foundation pads, LT/HT armored cable laying, dedicated earthing pits, and isolation switchgear installation.
Mounting & Commissioning
Precision hardware installation, terminal torque inspection, wiring termination, and initial power-on sequence testing.
Software & Network Setup
Configuring OCPP endpoints, cellular SIM provisioning, station registration on CSMS, payment gateway linking, and tariff setup.
Testing, Go-Live & Support
Comprehensive end-to-end charging test with actual EV vehicles, emergency stop checks, handover training, and 24/7 SLA maintenance.
Installations Across Diverse Property Types
We engineer specialized mounting, electrical distribution, and billing solutions tailored to specific commercial and residential property requirements.
Hotels & Luxury Resorts
Provide premium AC and DC top-up amenities for traveling guests, driving higher booking rates and room occupancy.
Shopping Malls & Retail Plazas
Monetize customer dwell time with high-power public charging while visitors shop, dine, and watch movies.
Corporate Offices & IT Parks
Attract eco-conscious talent and meet corporate ESG targets with seamless employee badge RFID charging.
Petrol Pumps & Fuel Outlets
Future-proof existing fuel stations along city arteries and highways with rapid turnaround DC fast dispensers.
Highway Corridors & Dhabas
Capture long-distance intercity travelers with high-speed DC charging during food and restroom breaks.
Residential Societies & RWAs
Safe, equitable apartment charging hubs with individual resident metering and zero burden on society management.
Commercial Fleet Depots
Turnkey high-volume charging infrastructure with automated scheduling for delivery vans, taxis, and buses.
Commercial Real Estate & Hospitals
Offer essential EV infrastructure for medical staff, patient families, and commercial tenants.
Rigorous Electrical Safety Standards
Every installation executed by Anax adheres to national electrical codes, Central Electricity Authority (CEA) guidelines, and international EVSE norms.
CEA Regulations Compliance
Engineered in compliance with the Central Electricity Authority (Measures relating to Safety and Electric Supply) Guidelines for EV charging stations.
Dedicated Chemical Earthing Pits
Dual low-resistance copper-bonded earthing pits (< 2 Ohms) ensuring total dissipation of fault currents and protecting delicate vehicle battery electronics.
Certified Electrical Engineers
Executions managed exclusively by certified electrical contractors and power systems engineers, backed by rigorous torque and insulation testing.
Request Site Survey & Installation Proposal
Submit your site and power specifications. Our certified EV electrical engineers will prepare a comprehensive turnkey installation plan.
Installation & Commissioning FAQs
Standard AC wallbox installations for corporate offices or residential societies typically take 2 to 5 business days after survey. Multi-gun DC fast charging plazas (60kW–120kW) involving dedicated transformer setup, civil foundation works, and DISCOM load enhancements typically require 2 to 4 weeks.